Denmark (DK1): the live status of western Denmark's electricity grid

Denmark pioneered modern wind power, and its western grid - DK1, covering Jutland and Funen - now regularly generates more electricity from wind than it consumes in total. This page covers DK1 specifically because that's where Viking Link, Denmark's only direct interconnector to Great Britain, comes ashore; DK1 is also part of the Continental Europe synchronous area, unlike eastern Denmark's DK2, which is Nordic-synchronous. Demand, generation, day-ahead price and generation mix below are live from the ENTSO-E Transparency Platform.

Illustrative figures - not yet connected to a live source

Data as of
Loading live data…
Day-ahead price
68.00/MWh
Demand
3.6GW
Generation
4.2GW

Illustrative figures in the rough range of DK1's actual totals, not a live reading. Each figure shows an illustrative trend over the last 3 hours.

Generation mix right now

Illustrative figures - see data sources.

Illustrative Denmark (DK1) generation by source
SourceGW%
Wind2.661.9
Wind (onshore)1.535.7
Wind (offshore)1.126.2
Fossil & biomass1.023.8
Biomass / waste (CHP)0.716.7
Gas0.37.1
Solar0.511.9
Other & storage0.12.4

    Wind alone regularly exceeds 100% of DK1's own demand - the surplus exports to Norway, Sweden, Germany and, via Viking Link, Great Britain.

    Generation by source right now, ranked highest to lowest.

    Generation mix over the last 24 hours

      Renewable (wind, solar, hydro, biomass), nuclear, fossil and other, from the ENTSO-E Transparency Platform.

      History

      Choose a time range to see real recorded demand, generation and day-ahead price over time, from the ENTSO-E Transparency Platform.

      About the Denmark grid

      Energinet operates Denmark's transmission grid, split into two non-synchronous halves: DK1 (Jutland and Funen, in the west, part of the Continental Europe synchronous area) and DK2 (Zealand, including Copenhagen, part of the Nordic synchronous area). Denmark built the world's first modern offshore wind farm, Vindeby, in 1991, and has kept expanding both onshore and offshore capacity ever since - DK1 alone now has enough wind capacity to exceed its own demand on a windy day, exporting the surplus across its many interconnectors to Norway, Sweden and Germany.

      District heating combined-heat-and-power (CHP) plants, increasingly burning biomass and waste rather than coal, provide a flexible complement to wind's variability, alongside a fast-growing solar fleet. Viking Link, which began commercial operation in Boxing Day 2023, gave DK1 its first direct electrical link to Great Britain - at roughly 765km of combined subsea and underground cable, it's the longest interconnector of its kind in the world.

      Context

      • Wind share of DK1 generationOften exceeds 100% of demand on windy days
      • World's first offshore wind farmVindeby, 1991 (since decommissioned)
      • Viking Link length~765km, world's longest land+subsea interconnector
      • Viking Link capacity1,400MW to Great Britain

      Approximate wind share of DK1 generation by year - among the highest of any grid in the world.

      Figures are approximate, gathered from public Energinet/ENTSO-E reporting rather than a long-run historical feed. Last checked: 23 August 2026.

      Data sources for Denmark (DK1)

      The Elexon Insights Solution, NESO Data Portal and Carbon Intensity API that power the Great Britain pages are GB-specific and don't cover Denmark (DK1), so this page draws on a different source instead:

      • ENTSO-E Transparency Platform - the pan-European grid data hub, required by EU regulation for every connected TSO (RTE included) to publish to. Powers demand, generation, day-ahead price, the generation mix, the 24-hour mix chart and the History section above, all via Denmark (DK1)'s own bidding zone. Requires the site operator's own free API token, obtained through a short registration process - shows "not enough recorded history yet" rather than a placeholder figure if one isn't set or ingestion hasn't run yet.

      Two figures aren't shown on this page at all: ENTSO-E doesn't publish emissions intensity, and its generation-per-type data doesn't include cross-border physical flow per interconnector (Viking Link), so rather than show a permanently illustrative placeholder for either, they're left out until a real source exists. See the sitewide data sources page for how this compares to the other pages.